Thirteen best practices in design and construction

Overview

Construction projects represent an area of significant risk for organizations in the form of potential cost overruns and missed deadlines. However, for organizations that employ proven best practices, effective collaboration between engineering and procurement can drive significant cost savings and increase the likelihood of on-time, and on-budget delivery of complex construction projects.

Based on our experience in working with clients to execute hundreds of construction projects spanning billions of dollars of spend on behalf of our clients, we’ve compiled a list of key best practices for design and construction projects. This is a summary list: Each individual best practice is worth its own detailed discussion, but the following list serves as a set of guideposts for organizations to consider when planning for major design and construction initiatives.

THIRTEEN DESIGN AND CONSTRUCTION BEST PRACTICES

  1. Involve Procurement Early:

    Procurement should be involved as early as project inception. In addition to being able to develop holistic project-level sourcing strategies, this allows for supplier pre-qualification, aggregation opportunities, budgetary quotes, and identifying incentive opportunities.

  2. Use a Team Charter:

    Establish a baseline up front including schedule, stakeholders, roles and responsibilities, savings methodologies, approvers, resources, and key issues to align expectation and minimize risk.

  3. Create Realistic Sourcing Schedules:

    Too often sourcing and contracting are compressed because of business requirements which results in less than desirable cost and additional risk. Early Procurement engagement can help make sure that proper sourcing timelines are weaved into overall project timelines.

  4. Develop Well Defined Scopes of Work and Specifications:

    The less defined the scope of work, the greater the supplier risk and therefore the potential project cost. Time spent up front defining scope will help to save time and money later in the project.

  5. Establish Strong Boilerplate Contracts with Pre-Agreed “Guardrails”:

    Sourcing time can be greatly reduced if agreements already exist for primary sourcing strategies. With upper and lower acceptable limits established for frequently contested terms, legal teams can negotiate faster.

  6. Compare Total Costs of Ownership:

    Suppliers should be evaluated on more than acquisition costs. Consideration should be given to the total life cycle cost of an asset or service (travel/freight, warranty, training, energy use, etc.).

  7. Agree upon Supplier Evaluation Criteria:

    Ideally every supplier is evaluated technically (quality, capability, longevity, etc.) and commercially (price, schedule, financial strength, etc.). Criteria should be established prior to receipt of any supplier proposals.

  8. Utilize an Electronic System to Manage Proper Toll Gates:

    A formal toll gate process will help to minimize Procurement bypasses. Compliance should be measured regardless of process.

  9. Implement a Supplier Performance Evaluation Program:

    Building long-term relationships with strategic suppliers can be mutually beneficial. One mechanism to monitor the ongoing quality of those suppliers is a formal, periodic evaluation process.

  10. Establish Long Term Contracts with Pricing, but Confirm Fair Value Annually:

    Suppliers prefer volume certainty and owners prefer cost predictability. Locking in pricing during turbulent times can help owners manage costs, but pricing should be reviewed annually to evaluate whether pricing is appropriate given market conditions.

  11. Incorporate Benchmarking and Market Intelligence into Sourcing Decisions:

    Real-time market intelligence will help drive appropriate sourcing strategies and confirm the best value is achieved.

  12. Integrate Energy Efficiency and Corporate Responsibility (CR) into Sourcing Criteria:

    Sometimes an untapped opportunity, such as savings around energy efficiency or energy credits, can drastically change a project’s Return on Investment (ROI). Utilizing suppliers that have a formal CR program will help mitigate risk.

  13. Improve Aggregation and Reduce Single-Source Situations:

    Leverage is the number one contributor to driving better overall value. Consider aggregation across business units, categories, and projects.

KEY ACTION

One of the most effective ways to contain construction project costs and increase the likelihood of on-time, on-budget delivery is to focus on up front planning and collaboration. The earlier that engineering and procurement teams can engage and begin to plan as a coordinated unit, the better they can use more advanced procurement practices, establish proactive checkpoints, and keep major projects on track. Consider this list of best practices and whether your organization is setting itself up for success, or potential risk, for upcoming design and construction projects.


Authors
Rod Freeman


Rod Freeman


Connect with Rody Freeman's Profile on LinkedIn. This opens a new window.
Mark Hillman

Mark Hillman


Connect with Mark Hillman's Profile on LinkedIn. This opens a new window.


Stay In The Know

Receive e-mails from Accenture featuring new content that matches your interests.

Visit the subscription center to make your selections and subscribe to New from Accenture.


SUGGESTED CONTENT