Trusted product data. Faster innovation.
Bring product, engineering, quality and supply chain teams together around trusted business data with Oracle Fusion Cloud PLM. Create greater visibility across the product lifecycle, improve cross-functional collaboration and accelerate the delivery of new products. Accenture Edge GoStarts accelerators provide a faster path to value and modernization.
Oracle Cloud PLM
You have an NPI or engineering change program starting in the next 12 months
Getting PLM in place before the program begins — not retrofitted afterward — is the difference between a structured launch and a reactive one.
You want PLM on the same data model as your ERP
The integration overhead of a separate PLM system is a problem you're ready to eliminate. One data model means no re-entry, no version mismatches and no reconciliation between systems.
Your quality team needs traceability from field defects back through production to design
The current tool set can't provide it. A connected quality management process can — and it starts with PLM integrated into the engineering change workflow.
You have budget approved and leadership aligned
What you need is a partner with mid-market PLM delivery experience and a defined implementation path.
PLM EXPERTISE
15+ years of delivery
Our PLM specialists work exclusively in manufacturing, high-tech and life sciences — no generalist SIs learning on your project. Mid-market manufacturers get a team that has delivered PLM implementations dozens of times across their industry.
IMPLEMENTATION SPEED
3-6 months to go-live
Pre-built accelerators for NPI, engineering change and quality management compress mid-market implementations — so the platform is live before the next product program starts.
NATIVE INTEGRATION
One data model. No reconciliation.
PLM deployed on the same data model as your ERP — the bill of materials, item master and supplier data engineering manages in PLM is the same data manufacturing and finance use.
ENGAGEMENT MODEL
One lead throughout
PLM implementation failure most often happens when the partner leaves after cutover and the internal team isn't equipped to manage the platform. One accountable lead stays through hyper-care.
Clear deliverables, measurable outcomes
- A connected PLM platform deployed across product data management, engineering change workflow and quality management
- Engineering change process automated — approvals, impact analysis and manufacturing notifications governed by workflow, not email
- Bill of materials synchronized between PLM and ERP — manual synchronization and version mismatch eliminated
- NPI stage-gate workflows live and running for the first product introduction post go-live
- Quality management integrated with engineering change — defects traceable from field through production back to design
- A documented baseline established before deployment, with performance tracked at 30, 60 and 90 days post go-live